The Conveyor Bridge F60 Overburden is a true engineering marvel, weighing an impressive 365 tonnes and measuring 502 meters in length. Constructed in 1991 by VEB TAKRAF Lauchhammer, an East German company, this massive structure was designed to transport overburden in open-pit mining operations. Despite its remarkable capabilities, the F60 was only in operation for 13 months before being decommissioned due to political and economic changes. Its sheer size and power highlight the advancements in mining technology during its time, making it a significant yet short-lived achievement in industrial engineering.